This past weekend we did several miscellaneous jobs at the house.
On Saturday we removed the wall framing that divided the small back bedroom. The room is now restored to it's original size. We also took down the remaining part of the drop ceiling in the kitchen.
On Sunday we started to remove all of the old plumbing. The hot and cold water pipes have been removed from the entire house but the drain pipes still remain. We hope to remove them this week.