

These are pictures of a wall in the hallway leading from the first floor foyer to the rear rooms. There were significant cracks in the wall and a long area in which the plaster had fallen off (or been destroyed by tenant and friends). The plaster is now 90% repaired. The area still needs a little attention on the corner, but the holes and cracks are gone.