The electricians have installed the rear lights at the house. They look pretty good.


We have stripped the old paint off the outside of the cast-iron tub and have started priming it. It will be white when we are finished.

We've spent most of the day loading the PODS for our move. The dogs stayed in the garage for part of the packing process. Not surprisingly, they wanted out.

Husband and doggie say goodbye to the old couch.

Monday, June 18, 2007

Contractor Update - June 18

The plumbers, drywall subs, electricians, and general contractor all worked at the house today. The plumbers started roughing in the PVC pipes, the drywall subs started taping and mudding the ceiling drywall, the electricians started rough wiring the addition and kitchen, and the general contractor framed in the new walls in the upstairs guest bathroom. They'll all be back on Tuesday along with the insulation contractor who's going to start insulating the attic.


Tuesday, June 12, 2007

June 12th Update

During the past week or so several things have been going on at the house. Here's a brief summary:

The roofing subs worked on the copper for the new box gutter on the addition. They've finished all of the metal work except for the downspouts which will be added later.



The windows for the addition have been installed. There's only some minor trim work left to do.



We sanded and primed the small back bedroom. There's still some touch up work left to do.


We also received our first mail at the house today. Not surprisingly it was all junk mail.

Thursday, June 07, 2007

Small Stained Glass Window

The small stained glass window has been removed to be repaired.



Friday, June 01, 2007

Drywall #2

The drywall subs finished hanging the drywall in the old section of the house. Next week they'll tape, mud, and sand everything.