During the past week a lot of work has been done at the house. The contractor framed in the two new closets in the front two bedrooms. The electricians have done the rough in wiring for about 85% of the existing house. We now have temporary lights in all of the rooms except the kitchen and several working electrical outlets.


We plan to use reproduction push button switches for all of the downstairs switches and the upstairs hallway switch.


All of the outside walls are plaster on brick which makes it hard to install wall outlets. Because of this a lot of the electrical and cable outlets will have to be in the floor.


We continue to work on fixing the plaster walls and front foyer ceiling. We've made a lot of progress but there's still a lot more to do.