This past weekend we continued to work on the plaster walls in the two front bedrooms. We're getting close to being done with the plaster wall/crack repairs. All we have to do now is sand, prime, and paint them.
On Sunday I spent several hours crawling around on the kitchen floor hammering in all of the nails and tacks that were sticking up from the wood floor. There were hundreds of them left in the floor after all of the old linoleum and carpet was removed last year.

Today the contractor replaced a small part of the kitchen floor that was water damaged with new wood sub flooring. He also put down a Durock cement board sub floor on top of the old wood floor to make it smooth and level for a ceramic tile floor.
On Sunday I spent several hours crawling around on the kitchen floor hammering in all of the nails and tacks that were sticking up from the wood floor. There were hundreds of them left in the floor after all of the old linoleum and carpet was removed last year.

Today the contractor replaced a small part of the kitchen floor that was water damaged with new wood sub flooring. He also put down a Durock cement board sub floor on top of the old wood floor to make it smooth and level for a ceramic tile floor.


The big dig begins on Tuesday.